Assembly / Testing

Assembled products range from heat and freeze assembled components, to complex 1,200 pound final drives with as many as 170 different components.
Full geared assemblies are routinely subjected to run-in and capability testing scenarios on one of three custom built dynamometers.
Complex assemblies have been built at volumes as high as 2,200 per year.

 

Testing Equipment Includes:

Pressure Test Unit
Several Leak Flow Testing Units
A Custom Built Spin Test Unit
And 3 Custom Fabbed Dynamometers
Copyright © 2016. Loc Performance Products, Inc.